Skip to content

Seismic Hazard and Earthquake Prediction

CSIR NET geophysics: hazard vs risk, deterministic and probabilistic hazard, return periods, ground motion, site effects, precursors and early warning.

  • 18 min read
  • Updated
On this page · 16 sections
  1. Prerequisites
  2. The Hook: One Town, Two Answers
  3. Hazard, Vulnerability and Risk
  4. Measures of Ground Motion
  5. Site Effects
  6. Deterministic Seismic Hazard Analysis (DSHA)
  7. Probabilistic Seismic Hazard Analysis (PSHA)
  8. Earthquake Prediction
  9. Earthquake Early Warning
  10. Memory Tricks
  11. Don’t Confuse
  12. Common Mistakes
  13. Practice
  14. Quick Revision Table
  15. Key Takeaways
  16. What’s Next

Prerequisites

The Hook: One Town, Two Answers


Hazard, Vulnerability and Risk

TermMeaning
Seismic hazardthe probability that a given level of ground shaking (or another effect: rupture, liquefaction, landslide, tsunami) is exceeded at a site within a time window. A property of nature
Vulnerabilityhow badly a building, structure or system is damaged by a given level of shaking
Exposurewhat is there: people, buildings, infrastructure, economic value
Seismic riskthe expected losses (lives, damage, money), combining hazard, vulnerability and exposure
$$\text{Risk} = \text{Hazard} \otimes \text{Vulnerability} \otimes \text{Exposure}$$

A remote region with very high hazard can have low risk (nobody there); a city with moderate hazard and weak buildings can have very high risk. Latur 1993 is the Indian textbook case: a moderate earthquake in a low-hazard region, with very large loss of life from heavy, unreinforced stone houses.

Measures of Ground Motion

ParameterMeaning
PGA (peak ground acceleration)the largest absolute acceleration, often in units of \( g \)
PGV, PGDpeak ground velocity and displacement
Response spectrum \( S_a(T) \)peak response of a damped (usually 5% damping) single-degree-of-freedom oscillator of natural period \( T \): what a building of that period feels
Durationtime with significant shaking; long durations raise damage and liquefaction
Intensity (MMI, MSK-64, EMS-98)observed effects on people and structures, I–XII

A building’s natural period is roughly proportional to its height; a common rule of thumb is about 0.1 s per storey. Tall buildings respond to long-period shaking, which travels far and is amplified in deep sedimentary basins; low buildings respond to short-period shaking, strongest near the source.

Ground-motion prediction equations (GMPEs)

A GMPE (attenuation relation) gives the expected ground-motion parameter and its scatter as a function of magnitude, distance, site condition and sometimes faulting style. A typical functional form is

$$\ln Y = c_1 + c_2 M - c_3\ln\left(R + c_4\right) - c_5 R + c_6 F + c_7 S + \varepsilon\sigma$$
  • \( c_2M \): bigger earthquakes shake harder (with saturation at large \( M \) near the fault).
  • \( \ln R \): geometric spreading; \( c_5R \): anelastic attenuation.
  • \( F \): faulting style; \( S \): site term.
  • \( \sigma \): the large aleatory variability, about a factor of 2 in amplitude for one standard deviation. Ignoring it badly underestimates hazard.

GMPEs are regional: attenuation is low in stable continental regions (shaking spreads farther, as in peninsular India) and higher in tectonically active regions.

Site Effects

Local geology modifies shaking strongly:

  • Impedance contrast: waves travelling from stiff rock into soft sediments slow down; energy conservation increases their amplitude. Amplitude amplification is roughly \( \sqrt{\rho_1 v_1/\rho_2 v_2} \) for a smooth transition, larger with resonance.
  • Resonance of a soft layer over rock: fundamental frequency
$$\boxed{f_0 = \frac{V_s}{4H}}$$

where \( V_s \) is the layer’s shear-wave velocity and \( H \) its thickness. Damage concentrates in buildings whose natural period matches \( 1/f_0 \). Mexico City (1985) is the classic case of lake-bed clays amplifying shaking from a distant earthquake.

  • \( V_{s30} \), the time-averaged shear-wave velocity of the top 30 m, is the standard site classification parameter in building codes and GMPEs.
  • Basin effects, topographic amplification at ridge crests, and liquefaction of loose saturated sands (sand boils, lateral spreading, loss of bearing capacity).
  • Horizontal-to-vertical spectral ratio (H/V) of ambient noise is a quick field estimate of \( f_0 \).

Seismic microzonation maps these effects at city scale (site classes, \( f_0 \), liquefaction potential) to refine regional hazard maps.

Deterministic Seismic Hazard Analysis (DSHA)

  1. Identify the relevant seismic sources (faults, source zones).
  2. Choose a controlling earthquake for each: often the maximum considered (credible) earthquake.
  3. Take the shortest distance from each source to the site.
  4. Compute ground motion with a GMPE (median, or median plus one standard deviation).
  5. Take the largest value as the design ground motion.

DSHA is transparent and gives a “worst reasonable case”. Its weakness: it ignores how often the earthquake happens, so it cannot weigh a frequent moderate event against a rare great one. It is used for critical facilities (nuclear plants, large dams) and as a check on probabilistic results.

Probabilistic Seismic Hazard Analysis (PSHA)

PSHA (the Cornell–McGuire approach) integrates over all possible earthquakes:

graph TD
    A["1. Source model
faults and areal zones"] --> B["2. Recurrence
truncated Gutenberg-Richter
or characteristic earthquake"] B --> C["3. Ground-motion model
GMPE with scatter sigma"] C --> D["4. Hazard integral
sum over sources, M, R, epsilon"] D --> E["5. Hazard curve
annual rate of exceedance vs PGA or Sa"] E --> F["6. Uniform hazard spectrum,
maps, design values"]

The annual rate at which ground motion \( Y \) exceeds a level \( y \) is

$$\lambda(Y > y) = \sum_{\text{sources } i}\nu_i\iint P(Y > y\mid m, r)\,f_M(m)\,f_R(r)\,dm\,dr$$

with \( \nu_i \) the rate of earthquakes above a minimum magnitude on source \( i \), \( f_M \) and \( f_R \) the magnitude and distance distributions, and \( P(Y > y\mid m, r) \) from the GMPE including its scatter.

Return periods and exceedance probabilities

If exceedances follow a Poisson process with rate \( \lambda \) per year:

$$\boxed{P(\text{at least one in } t\ \text{years}) = 1 - e^{-\lambda t}}\qquad\boxed{T_R = \frac1\lambda = \frac{-t}{\ln(1 - P)}}$$
Design levelReturn period
10% probability of exceedance in 50 years\( -50/\ln 0.9 = 474.6 \approx \) 475 years
2% probability of exceedance in 50 years\( -50/\ln 0.98 = 2474.9 \approx \) 2,475 years

For small \( \lambda t \), \( P \approx \lambda t \).

Uncertainties

  • Aleatory variability: natural randomness (GMPE scatter, the timing of earthquakes). Included in the hazard integral.
  • Epistemic uncertainty: lack of knowledge (which GMPE, maximum magnitude, b-value, source geometry). Handled with a logic tree of alternative models with weights, giving mean and fractile hazard curves.
  • Disaggregation shows which magnitudes and distances contribute most to the hazard at a chosen level; it identifies the scenario earthquakes to use in design.

Recurrence models

  • Truncated Gutenberg–Richter: \( \log_{10}N = a - bM \), cut at a maximum magnitude \( M_{max} \).
  • Characteristic earthquake model: some faults rupture repeatedly in similar-sized events, more often than G–R extrapolation from small events predicts.
  • Time-dependent (renewal) models: probability rises with time since the last event (for example, using Brownian passage time or lognormal distributions), unlike the memoryless Poisson model.
  • Moment-rate balancing: the long-term seismic moment rate from all earthquakes must not exceed the moment rate supplied by fault slip, \( \dot M_0 = \mu A\dot s \).

Earthquake Prediction

A useful prediction must specify the time, place and magnitude with stated uncertainties and do better than chance. That standard has not been met. A forecast gives probabilities over years to decades and is routinely produced.

Proposed precursors

PrecursorIdeaStatus
Foreshockssmall events before the mainshockonly some mainshocks have them; they cannot be recognised as foreshocks until afterwards
Seismic quiescence or activationrate changes before large eventsreported retrospectively; hard to use prospectively
b-value changesb may fall as stress risesvariable; noisy
\( V_P/V_S \) anomaliesdilatancy–diffusion model: microcracking (dilatancy) before failure lowers \( V_P/V_S \); fluid inflow restores it shortly before the earthquakeearly claims in the 1970s not confirmed by later careful studies
Radon and groundwaterchanges in gas emission, well levels, chemistrysome striking cases; no consistent pattern
Ground deformationuplift, tilt, strainslow-slip and transients are real, but rarely diagnostic
Electrical and electromagneticresistivity, ULF signals, ionospheric anomaliescontroversial; not reproducible
Animal behaviouranecdotalnot testable as a method

Case histories

  • Haicheng, China (1975): a magnitude about 7.3 earthquake preceded by a strong foreshock sequence; an evacuation is credited with saving many lives. It is generally regarded as a special case rather than proof of a method.
  • Tangshan, China (1976): a devastating earthquake that was not predicted, the following year.
  • Parkfield, California: moderate earthquakes on this segment of the San Andreas fault recurred fairly regularly, leading to a forecast of the next one by about 1993. It came in 2004, more than a decade late, without clear short-term precursors, despite dense instrumentation.

What is done instead

  • Long-term forecasts from geology (slip rates, palaeoseismology), geodesy and catalogues, including seismic gap arguments: segments of active boundaries that have not ruptured for a long time are candidates for future large earthquakes. Time-predictable and slip-predictable recurrence models refine this, with limited success.
  • Operational earthquake forecasting: short-term probabilities that rise after a large earthquake, because aftershocks (and occasionally larger events) cluster in time (Omori decay).
  • Earthquake early warning (EEW).

Earthquake Early Warning

EEW is not prediction: it detects an earthquake that has already begun and warns places farther away before the strong shaking arrives. It uses the fact that P waves travel faster than the damaging S and surface waves, and that electronic signals travel far faster than either.

graph LR
    A["Rupture starts"] --> B["P wave reaches
nearest stations"] B --> C["Rapid location and
magnitude estimate"] C --> D["Alert sent
(near light speed)"] D --> E["Target receives alert
before S wave arrives"]

The lead time at a target at hypocentral distance \( r \) is

$$\boxed{t_{lead} = \frac{r}{V_S} - t_{alert}}$$

where \( t_{alert} \) is the time after origin at which the alert is issued (P travel time to enough stations plus processing and transmission). Places close to the epicentre fall in a blind zone where \( t_{lead} \le 0 \).

Two approaches: regional (network-based) systems use several stations near the source; on-site systems use the early P wave at the target itself (smaller lead time, no blind zone at the site). EEW systems operate in several countries; in India, a regional early-warning system has been developed for parts of the Himalaya.


Memory Tricks

Don’t Confuse

ThisvsThat
Hazard: probability of shakingRisk: expected loss
DSHA: one controlling scenario, no ratesPSHA: all scenarios weighted by rate, gives probabilities
Aleatory variability (randomness)Epistemic uncertainty (lack of knowledge; logic trees)
Return period \( 1/\lambda \)Exposure time (design life, e.g. 50 years)
Prediction: time, place and size in advanceForecast: probability over years
Early warning: after rupture startsPrediction: before rupture starts
PGA: peak of the groundSpectral acceleration: peak of an oscillator of period \( T \)
Magnitude: source sizeIntensity: effects at a site
Poisson model: memorylessRenewal model: probability grows with elapsed time

Common Mistakes


Practice

All questions below are original practice questions written for this page. They are not from any CSIR NET paper.

Level 1: Foundation

  1. What return period corresponds to a 10% probability of exceedance in 50 years?
  2. Write the fundamental resonance frequency of a soft layer of thickness \( H \) and shear velocity \( V_s \).
  3. Name the three factors that combine into seismic risk.
Answers
  1. About 475 years.
  2. \( f_0 = V_s/(4H) \).
  3. Hazard, vulnerability and exposure.

Level 2: Part B Style

Practice Q1. A ground-motion level has an annual exceedance rate of 0.002. The probability of at least one exceedance in a 50-year design life is about:

(a) 2% (b) 10% (c) 18% (d) 63%

Answer: (b) 10%

\( P = 1 - e^{-0.002\times50} = 1 - e^{-0.1} = 1 - 0.905 = 0.095 \), about 10%. (Return period 500 years.)

Practice Q2. A 40 m thick sediment layer has \( V_s = 400 \) m/s. Its fundamental site period is:

(a) 0.10 s (b) 0.40 s (c) 2.5 s (d) 10 s

Answer: (b) 0.40 s

\( f_0 = 400/(4\times40) = 2.5 \) Hz, so \( T_0 = 0.40 \) s. Option (c) confuses frequency with period.

Practice Q3. Which statement correctly distinguishes DSHA from PSHA?

(a) DSHA includes the rates of earthquakes; PSHA does not. (b) PSHA integrates over all magnitudes and distances weighted by their rates; DSHA uses a controlling scenario. (c) DSHA gives a hazard curve; PSHA gives a single value. (d) PSHA cannot include uncertainty in ground-motion models.

Answer: (b)

Rates and integration are the essence of PSHA; DSHA uses a scenario. Epistemic uncertainty in PSHA is handled by logic trees.

Practice Q4. Which observation is the strongest evidence that a proposed precursor is useful?

(a) It was found in the records after one large earthquake. (b) Many anecdotal reports describe it before several earthquakes. (c) It has been tested prospectively, with false alarms and misses counted, and beats a random forecast. (d) It has a plausible physical mechanism.

Answer: (c)

Retrospective and anecdotal evidence is weak; a mechanism is necessary but not sufficient. Prospective testing against a null model is the standard.

Level 3: Part C Style

Practice Q5. A source zone follows \( \log_{10}N = 4.2 - 1.0M \), where \( N \) is the annual number of earthquakes of magnitude \( \ge M \). Assume a Poisson process. Which statements are correct?

  1. The annual rate of \( M \ge 6 \) earthquakes is about 0.016.
  2. The mean recurrence of \( M \ge 6 \) events is about 63 years.
  3. The probability of at least one \( M \ge 6 \) in 50 years is about 55%.
  4. The probability of at least one \( M \ge 7 \) in 50 years is about 7.6%.

(a) 1 and 2 only (b) 1, 2 and 3 only (c) 1, 2, 3 and 4 (d) 3 and 4 only

Answer: (c) 1, 2, 3 and 4
  • \( N(6) = 10^{4.2 - 6} = 10^{-1.8} = 0.0158 \). True.
  • \( 1/0.0158 = 63.1 \) years. True.
  • \( 1 - e^{-0.0158\times50} = 1 - e^{-0.792} = 1 - 0.453 = 0.547 \). True.
  • \( N(7) = 10^{-2.8} = 0.00158 \); \( 1 - e^{-0.0792} = 0.076 \). True.

Practice Q6. An early-warning network detects an earthquake when the P wave reaches the nearest station; processing and transmission then take 4 s. Take \( V_P = 6.0 \) and \( V_S = 3.5 \) km/s and ignore depth (treat distances as hypocentral). The nearest station is 12 km from the hypocentre. Which statements are correct?

  1. The alert is issued 6 s after origin time.
  2. A city 70 km away receives about 14 s of warning before the S wave.
  3. Everywhere within 21 km of the hypocentre is in the blind zone.
  4. Halving the processing time to 2 s increases the lead time at every site beyond the blind zone by 2 s.

(a) 1, 2, 3 and 4 (b) 1 and 2 only (c) 2 and 4 only (d) 1, 3 and 4 only

Answer: (a) 1, 2, 3 and 4
  • P at nearest station: \( 12/6 = 2 \) s; alert at \( 2 + 4 = 6 \) s. True.
  • S at 70 km: \( 70/3.5 = 20 \) s; lead \( = 20 - 6 = 14 \) s. True.
  • Blind zone: \( r = 3.5\times6 = 21 \) km. True.
  • Lead time \( = r/V_S - t_{alert} \): a 2 s reduction in \( t_{alert} \) adds 2 s everywhere (and shrinks the blind zone to 14 km). True.

Practice Q7. Hazard curves for a site give annual exceedance rates of 0.01 for PGA = 0.10 g and 0.002 for PGA = 0.25 g. A school is designed for a 50-year life. Which statements are correct?

  1. PGA = 0.25 g corresponds roughly to the “10% in 50 years” level.
  2. The probability that 0.10 g is exceeded at least once in 50 years is about 39%.
  3. If the school’s life is extended to 100 years at the same design level of 0.25 g, the probability of exceedance roughly doubles to about 18%.
  4. Because 0.10 g has a return period of 100 years, it cannot be exceeded twice in 100 years.

(a) 1, 2 and 3 only (b) 1 and 4 only (c) 2 and 3 only (d) 1, 2, 3 and 4

Answer: (a) 1, 2 and 3 only
  • \( 1 - e^{-0.002\times50} = 0.095 \), about 10%. True.
  • \( 1 - e^{-0.01\times50} = 1 - e^{-0.5} = 0.393 \). True.
  • \( 1 - e^{-0.002\times100} = 1 - e^{-0.2} = 0.181 \), roughly double. True.
  • Poisson events can occur any number of times: \( P(\ge 2) = 1 - e^{-1}(1 + 1) = 1 - 2/e = 0.264 \). False.

Quick Revision Table

IdeaFact or formula
Riskhazard ⊗ vulnerability ⊗ exposure
Ground motionPGA, PGV, PGD, \( S_a(T) \) at 5% damping, duration
Building periodabout 0.1 s per storey (rule of thumb)
GMPE\( \ln Y \) vs \( M \), \( \ln R \), \( R \), site, style; \( \sigma \) about a factor of 2
Site resonance\( f_0 = V_s/4H \); \( V_{s30} \) classes; H/V ratio
DSHAcontrolling earthquake, shortest distance, no rates
PSHAsources → recurrence → GMPE → integral → hazard curve
Poisson\( P = 1 - e^{-\lambda t} \); \( T_R = -t/\ln(1 - P) \)
Design levels10%/50 yr → 475 yr; 2%/50 yr → 2,475 yr
Uncertaintyaleatory (in integral), epistemic (logic tree); disaggregation
Recurrence modelstruncated G–R, characteristic, renewal, moment balance
India codeIS 1893 (Part 1): 2016 zones II–V, factors 0.10–0.36 (check current edition)
Precursorsforeshocks, quiescence, b-value, \( V_P/V_S \) (dilatancy–diffusion), radon, deformation, EM: none reliable
CasesHaicheng 1975 (evacuation), Tangshan 1976 (missed), Parkfield (2004, late)
EEW\( t_{lead} = r/V_S - t_{alert} \); blind zone; regional vs on-site

Key Takeaways

What’s Next

Advertisement
Advertisement